Water Works
1. Water Supply
Engineering works
System designs including source development, head works,
treatment plants, distribution network, including detailed
Engineering designs;
Performs various stages of studies on water works pertaining
to pre investment, prefeasibility, feasibility, and detailed
project preparation and implementation;
Water resources appraisal and development studies for water
supply covering surface, ground water, water harvesting,
etc;
2. Sanitary
Engineering works
System designs including sewerage networks, west water
treatment plants and land fill sites solid-waste management
technologies;
Consult in sustainable wastewater and solid-waste management
technologies;
3. Master plan studies for urban and rural water supply and sanitation projects;
4. Hydraulic
engineering works
Small scale dams, river diversion, river training and flood
protection works and storm water drainage works;
Small scale irrigation and hydraulic structures;
5. Preparation of detail specifications, measurement of quantities, Engineering cost estimates and tender documents;
6. Construction supervision services and contract administrations.
Client: Arbaminch University
Project cost: 2,963,186.22ETB
Location: Arbaminch
Project Type: Arbaminch University Business
Faculty master plan study and design
Client: Ethiopian Road Authority
Project cost: 4,268,100ETB
Location: Oromia Region
Project Type: Shasemene - Dodola Heigh way
Drainage system study and design
Client: Assela Melt Factory
Project cost: 5,518,900ETB
Location: Assela
Project Type: Assela Melt Factory additional
water supply and drainage system study and
design
Client: Mekele University
Location: Mekele
Project Type: Mekele University Indayesus campus
wastewater management study and design
Client: Jimma University
Location: Jimma
Project Type: Jimma University main campus waste
supply system upgrading study and design
Client: Jimma University
Project cost:46,872,610ETB
Location: Jimma
Project Type: Jimma University main campus
wastewater treatment system construtcion
supervision
Client: Muger Cement Factory
Project cost:4,527,710ETB
Location: Muger
Project Type: Muger Cement Factory Residential
Premises Sewage System Study & Design
Client: Gonder University
Project cost: 23,481,653.35ETB
Location: Gonder
Project Type: Gonder University waste water
drainage & treatment construction
supervision
Client: Arbaminch University
Location: Arbaminch
Project Type: Arbaminch University &Business
Faculty Site sanitary and storm drainage
design works
Client: Ambo University
Project cost:1,678,759.65ETB
Location: Ambo
Project Type: Ambo Agriculture College Site &
Storm Drainage Design Works