Geotechnical Works
1. Field
Investigation
The field investigation process performs Foundation
Investigation and Recommendation, construction material and
soil testing activities including investigation of large
dams;
Recommendation including foundation type, depth and bearing
capacity of the foundation strata;
In-situ testing such as Permeability, Standard Penetration
Test along with undisturbed soil sampling;
2. Construction
Material and Soil Testing
Concrete, Asphalt, Steer, Masonry, Bituminous, cement, tiles
etc.
Rocks (classification, Strength, characteristics etc).
3. Pile & plate, load test
Client: Water works design & supervision
enterprise
Location: Kesem River(Oromya)
Purpose: For Irrigation
Year:2005 GC
Project: Kesem Dam
Client: Water works design & supervision
enterprise
Location: Dedesa River(Oromya)
Purpose: For Irrigation
Year:2006GC
Project: Arjo Dedesa Dam
Client: Water works design & supervision
enterprise
Location: Gumera River(South Gonder)
Purpose: For Irrigation & flood control
Year:2007GC
Project: Gumera Dam
Client: Awash Bank & Awash Insurance Company
Location: Addis Ababa
Purpose: Head Quarter of the Company
Year:1999GC
Project: 18 story Building with 2 Basement
floors
Client: Civil Aviation Authority
Location: Bole International Airport / Addis
Ababa
Purpose: Equiped with full facilities &
services required for terminal
Year:1997GC
Project: Terminal Building
Client: Civil Aviation Authority
Location: Addis Ababa, Bole
Purpose: For landing & take-off service of
modern jets
Year:1997GC
Project: Run-way(4m long)
Client: Huda Real Estate
Location: Addis Ababa
Purpose: Multi-purpose Building Dominated by
offices
Year:1997GC
Project: 22 story building with 2 basements
Client: Sheraton Addis
Location: Addis Ababa
Purpose: Five star with full facilities
Year:1995GC
Project: Hotel
Client: Southern People's Health Bureau
Location: Awassa
Purpose: Referral Hospital
Year:1995GC
Project: Hospital
Client: Ethiopian Electric Light & Power
Corporation
Location: Gilgel Gibe River (Oromya)
Purpose: Hydro Power
Year:1993GC
Project: Gibe One Dam
